A conveyor's load point is the one place on the whole route where material arrives with energy it did not get from the belt. Everything downstream of the skirt boards is a transport problem. The first two metres are a collision problem, and the surface that takes the collision is almost always the belt, because the belt is the only thing in the path that is allowed to flex.
How hard that collision lands depends far more on drop height than on tonnage. The energy carried by a single lump rises with its mass, but it rises with the square of the speed picked up in free fall, and that speed climbs with the square root of the drop. Half a metre of extra chute can put more energy into one stone than doubling the throughput through a shorter drop. Two plants with the same belt width and the same capacity can therefore have load point lives that differ by a factor of five, which is why a transfer house destroys belts in months while the main incline runs for years.
Send us your drop height, lump size and belt speed for a bed layout review
The strike is only half of it. Between troughing idlers the belt is unsupported, and spacing is normally somewhere between one and one and a half metres. A lump that lands between two rolls pushes the belt down into that gap, bends the carcass over a short radius at the shoulders of the neighbouring rolls and pinches the cover between the stone and the roll shell. What comes out of that is a dent which never fully recovers, a ply separation that begins under the cover, and a section of industrial conveyor belt that looks sound from the walkway until it delaminates in a strip half a metre long.
Two failure modes arrive in the same event. Cutting from above, fatigue from below.
The useful question at a transfer is not how to build something strong enough to survive the impact, because the chute and the structure already do that. The job is to move that energy into a replaceable part, so the question becomes which component you are willing to destroy and how quickly it can be changed. Impact energy is not absorbed by strength. It is absorbed by deformation and by wear, and both of those have to happen inside a part that is small, inexpensive and reachable from the walkway. A sacrificial bar that loses ten millimetres in a year is doing exactly what it was bought to do. A belt cover that loses ten millimetres in a year is a shutdown, a splice and a crane.
That is why the most common answer at a cutting transfer is also the most expensive one, measured against the protection it actually delivers. When a belt starts getting cut, the first move is to reorder the same construction with a heavier cover, and the second is to upgrade to a cut and impact resistant grade. Both help, and both are limited in the same way, because cover compound resists abrasion and cutting without removing energy from the carcass. A twelve millimetre cover passes the same blow through to the plies as an eight millimetre cover does, so what it buys is time before the cover is breached rather than protection for what sits underneath. It also adds mass to accelerate at every start and raises the strain at the drive pulley. Any conveyor belt manufacturer will quote it without argument, because the request is easy to fill.
There is a worse version of the same mistake. Heavy cover conceals damage. A twelve millimetre cover can swallow an eight millimetre cut and look untouched while the breaker fabric below it is already torn. The next lump opens the wound, and what fails is not the cover but the splice or the carcass, usually on a shift when nobody is looking for it. On any belt where the cover is being asked to do structural work, inspection stops being a walk-past and becomes a measurement with a datum, a gauge and a schedule.
None of this makes cover grade irrelevant. Fine material at a modest drop, a clean chute and a steady feed will run for years on a well-chosen abrasion resistant conveyor belt, and that is the cheapest correct answer available. The distinction is about what the cover is being asked to do. If the cover is the wear surface, grade it properly and stop worrying about it. If the cover is being asked to absorb a stone that fell three metres, it is the wrong component in the wrong place, and no compound on the market changes that.
One transfer we were called to had been through three belt specifications in eighteen months, each thicker than the last, and the cutting had not moved. The chute discharged 2.4 m above the belt surface onto a 1,200 mm wide belt running at 2.8 m/s, and the gap between the last two idlers sat directly under the stream. A straight edge across the rolls showed 38 mm of sag with the belt loaded. The belt was not being cut by the stone so much as folded into a gap and pinched there, and a fourth belt would have failed the same way. The fix was 2.6 m of continuous supported surface.
The rest of this page stays on the bed itself, meaning the bars, the cushion underneath them, the frame that carries them and the geometry that decides whether the belt actually lands on them. Rollers get one section here only so the two options can be compared honestly; the mechanics of impact rolls, their disc stacks and the way they deflect are covered in how impact rollers protect conveyor belts, and that page is the right place to start if you have already decided on rolls.
An impact bed is a short, heavily built section of conveyor that replaces the troughing rolls under a transfer with a continuous sliding surface. It is not one product but a stack of four, and each interface in that stack does a different job. From the top down the order never changes: belt, bar, cushion, frame, structure. Confusing any two of those layers is how beds get specified badly.
The bar is the only part that touches the belt. It is a replaceable polymer or rubber block, usually one to two metres long, 100 to 200 mm wide and 50 to 100 mm thick, laid across the belt in a staggered pattern so no continuous joint runs the length of the bed. Both ends are chamfered and the fixing heads sit in counterbores with plugs over them, because anything standing proud of the surface will pick up a belt edge and start a tear.
Under the bars sits the cushion, a layer of rubber pads typically 25 to 75 mm thick and in the middle of the 55 to 70 Shore A range. It is the spring in the system. A point load spreads across four or five bars instead of one, and the surface deflects a few millimetres so the peak force is stretched over a longer time. Cushion that is too hard turns the bed into a rigid anvil. Cushion that is too soft bottoms out on the frame and takes a permanent set.
The frame holds the bars at the right height and the right angle, and it is the part that has to survive the horizontal drag of material that arrives with forward velocity and then has to be slowed to belt speed. Side rails, cross members and adjustable bar seats are normal; shimming under the rails to set the profile is normal too. What is not normal is a frame light enough to flex every time a lump lands, because a flexing frame works its bolts loose and eventually cracks at the welds.
The fourth interface is the structure below, and it is the one most often left out of the conversation. A bed does not absorb energy. It hands it down into the stringers and the chute steel.
| Layer in the support stack itself | What it is asked to do | Typical form, size and material range | How it announces that it is finished | What to check on a walk-past |
|---|---|---|---|---|
| Replaceable wear bar in the top position | Takes the strike and gives up material instead of the belt | Polymer or rubber block, 1,000 to 2,000 mm long and 50 to 100 mm thick | Thickness drops until the fixing counterbores break through to the surface | Measure remaining thickness at a marked datum, not by eye |
| Rubber cushion pad under each bar | Spreads one lump across several bars and stretches the peak force | Rubber pad 25 to 75 mm thick, mid-range hardness, bolted or bonded | Goes flat and stays flat, so the surface no longer springs back after a hit | Press down on the bar by hand and watch whether it returns |
| Support frame with adjustable bar seats | Holds bar height and trough profile, resists the drag of slowed material | Welded side rails and cross members bolted to the stringers or chute steel | Bolts work loose, welds crack at the rail ends, the profile drifts out of line | Check bolt witness marks and look for rust streaks at the welds |
| Stringer and chute structure directly below | Carries the collected load away without deflecting under each strike | Existing structural steel, sometimes needing extra stiffeners under the bed | Visible movement or paint cracking when a large lump lands on the section | Watch the frame while the belt is loaded, not while it is empty |
Buyers often describe this assembly as an impact bar conveyor, which is a fair name for the section and a misleading name for the purchase. What you are buying is a loaded surface with a defined wear allowance, not a conveyor. The bars will be replaced three or four times in the life of the frame, and the frame will be replaced once in the life of the structure. Design the access around that ratio and the maintenance cost stays where it belongs.
The components around the bed matter as much as the bed. Skirt rubber hanging too low drags on the belt and adds load the bed was never sized for, while skirt rubber hanging too high lets the discharge stream escape sideways and wear the belt edges instead of the bar centres. Conveyor components that seal the chute and the load point belt support have to be chosen together, because they share the same two metres of belt and the same maintenance window.
This page has to be explicit about its own boundary. The site already covers impact rollers, including what rolls do at a transfer, how the disc stack deflects and how the roll gap changes the pressure on the belt, and none of that is repeated here. What follows deals with the continuous support surface, meaning bars on a cushion in a frame, and uses rollers only as the thing a bar bed is compared against.
Comparing two options is not enough, because most plants arrive at this decision having already tried a third. The realistic choice at a cutting transfer is between a heavier cover on the same belt, a set of impact rolls in the same idler frames, and a bar bed that replaces the frames altogether. Put them side by side and the trade is not about strength at all. It is about how much energy each option removes from the carcass, how much of the wear lands on a part you can carry up the stairs, and what each one does to the rest of the conveyor.
| Option installed at the load point | How it handles the arriving energy | What it protects and leaves exposed | Recurring cost driver to plan for | Duty where it is the right answer | Duty where it quietly fails in service |
|---|---|---|---|---|---|
| Heavier cover on the same belt construction | Absorbs almost nothing, passes the blow through to the plies with more rubber in the way | Buys time before the cover is breached, leaves the carcass and splice unprotected | Replacing a full belt length to fix two metres of wear at the chute | Fine material, modest drop, clean chute and a steady controlled feed | Large sharp lumps, drop over two metres, or a discharge aimed between idlers |
| Impact rolls in the existing idler frames | Deflects on a rubber disc stack and returns the energy as a spring does | Protects the roll contact points, still leaves open gaps between the frames | Disc stack wear and shell damage, replaced one roll at a time as frames fail | Moderate drop, material that will not jam a roll, plants that standardise on rolls | Very sharp lump edges, high drop, or sticky material that packs between discs |
| Impact bed with bars on cushion blocks | Spreads the blow across several bars, deflects a few millimetres and wears instead of the belt | Removes the unsupported gap entirely, keeps the belt flat under the discharge stream | Bars and cushion pads as scheduled consumables, plus the drag they add to the drive | High drop, heavy lump mass, sharp rock, short maintenance windows on a busy line | Wet sticky clay, thin drive margin, or a bed run far longer than the settling zone |
| Bed under the chute with rolls downstream | Takes the peak where it is highest, then hands over to rolling support once settled | Covers the whole impact zone without paying the drag penalty along the full conveyor | Two spares lists and one transition detail that has to be built correctly the first time | Most bulk transfers, especially where the skirt boards run three metres or longer | Transfers where the settling point moves with throughput and cannot be pinned down |
The last row is the layout that most well-run plants end up with, and it is worth saying why. A bar bed is expensive in drag, because a belt sliding on polymer takes more force than a belt rolling on idlers. That penalty is worth paying for the two or three metres where the lumps land and is not worth paying for the next two hundred metres. Conveyor rollers are the better support everywhere the material has already matched belt speed, and the transition between the two support types is where the next problem usually starts.
Where bars lose is predictable. Sticky material that builds up between bars turns the surface into a rasp and wears the cover from below, which is a failure mode rolls do not have. A drive with no margin notices the extra drag at every start, especially on a loaded incline. Long beds on high-speed belts also run hotter than expected in still air. None of these are reasons to avoid a bed at a genuine impact zone, and all of them are reasons not to extend one further than the job requires.
Roll selection itself is a separate decision, and the geometry of trough angle and spacing either side of the bed belongs with the idler layout rather than here. If the section downstream of the transfer is being reviewed at the same time, the practical starting point is troughing idlers, trough angle, spacing and roller grade selection, because the bed has to match the profile those rolls impose. A bed set to 35 degrees feeding into a 45 degree trough is a belt training problem waiting for its first shift.
Sizing starts with a number almost nobody has on file, which is the mass of the largest lump rather than the average. A transfer handling screened material at a steady 900 tonnes per hour can be gentler than one handling 300 tonnes per hour of run-of-mine rock, because the second line delivers individual pieces that weigh more than a person. Ask for the top size and the shape, since a flat slab lands differently from a rounded cobble of the same mass.
Speed matters twice. It sets how much energy the lump carries, and it sets how far the material travels forward before it settles, which is the number that decides how long the bed has to be. A discharge stream that lands 800 mm downstream on a slow belt can land 1.6 m downstream on a fast one, and a bed sized for the first case will be half empty in the second. On a recent cement plant transfer running at 3.5 m/s, and on a port terminal running the same belt width, we watched the landing point move almost a metre between an empty belt and a fully loaded one, because material was riding on itself.
| Severity band seen at the transfer | Drop and lump signature to expect | Support that usually suits the duty | Bar and cushion allowance to plan for | What goes wrong if it is under-built |
|---|---|---|---|---|
| Light duty with a settled material feed | Drop under one metre, small top size, material already moving with the belt | Standard troughing rolls at normal spacing, no bed required at all | None, other than a cover grade chosen for the abrasion of the material | Little, which is why adding a bed here is money spent for no return |
| Moderate duty with mixed lump sizes | Drop of one to two metres, occasional lumps near the top size, belt speed around 2 m/s | Two to three metres of bed under the skirt, with rolls either side of it | Bars 50 mm thick on 25 to 40 mm cushion, checked twice a year | Cover cutting and ply separation begin between the last two idler frames |
| Heavy duty handling coarse run-of-mine rock | Drop of two to four metres, large angular lumps, belt speed above 2.5 m/s | Continuous bed through the whole impact zone and past the settling point | Bars 75 to 100 mm thick on 50 mm cushion, with a full set of spares on site | Belt is breached at the discharge line within weeks and the splice fails next |
| Severe duty with a rock box or dead bed | Drop over four metres, very heavy lumps, or a chute that cannot be shortened | Rock box to take the first strike, bed below it to protect what still arrives | Thickest bars available, cushion upgraded, and a documented replacement interval | Even a heavy bed is consumed quickly, and the structure itself starts to fatigue |
Length is a measurement, not a formula. The bed has to continue until the material has stopped moving relative to the belt, because everything before that point is still delivering energy sideways into the surface. In practice that means running the supported section at least a metre past the end of the skirt boards and then watching where the belt stops deflecting. Chalk a line across the belt, run it loaded, and see where the chalk survives. The place it survives is where the bed can stop.
Width is simpler but no less important, and it is one of the questions a conveyor belt supplier should settle before the drawing is issued. Bars are made to suit the belt width and, on a troughed bed, are built as a centre bar with two angled wing bars so that the surface follows the trough rather than sitting flat across it. A flat bed under a 35 degree trough forces the belt to flatten as it crosses the transfer and then re-trough immediately afterwards, which is a training problem and a fatigue problem at the same time.
Nearly every bar sold today is some grade of ultra-high molecular weight polyethylene, and the arguments about which grade are usually arguments about the wrong variable. The polymer's job is to slide under a loaded belt with as little friction as it can manage while giving up material slowly and predictably. Friction and wear resistance both come from the same place, which is a very long molecular chain, and neither of them is visible in the colour of the block.
Two failure signatures matter more than any datasheet figure. The first is creep, where a bar under continuous load gradually flattens and the surface that was set 2 mm below the belt ends up 6 mm below it, so the belt stops touching the bed exactly where the load is heaviest, and the rubber conveyor belt goes back to spanning a gap. The second is embedment, where fine grit works into the polymer surface and turns a sliding face into a grinding face. A bar that has gone grey and gritty across its centre has stopped being a bearing surface, whatever its measured thickness says.
Rubber bars sit at the other end of the trade. They grip the material rather than letting it slide, which helps a discharge stream settle quickly and reduces the forward skid that causes spillage at the skirt line. They also absorb energy in their own thickness instead of passing it straight through. The trade-off is wear rate, because rubber sliding under a loaded belt with grit between the surfaces generates heat and tears.
Composite bars with ceramic or steel inserts exist for the transfers where nothing else survives, usually where the lump is both heavy and sharp and the drop cannot be reduced. They work, and they carry a specific risk that has to be designed out. Any insert that stands proud of the polymer, or any insert that wears slower than the polymer around it, becomes a hard edge sitting in the belt's path. A ceramic tile that survives while its surrounding polymer wears away will eventually score the cover along its whole length.
| Bar material family in common use | Sliding and wear behaviour under load | Duty where it earns its place | Duty where it disappoints in practice | Selection cue worth asking the supplier about |
|---|---|---|---|---|
| Virgin grade ultra-high molecular weight polymer | Lowest friction of the common options, wears smoothly and predictably across the face | Dry abrasive rock, high belt speed, transfers where drag has to stay low | Hot material above its softening range, or sustained load that flattens the bar | Ask for the grade and the source, not for the colour of the block |
| Reprocessed polymer made from mixed regrind | Friction is close but wear is uneven, with pits and tears appearing before the face is worn | Light duty transfers where the bar is a guide rather than a wear part | Any transfer with sharp lump edges, where the pits become crack starters | Ask whether the block is virgin or regrind before comparing two quotes |
| Rubber bar bonded to a steel backing strip | Higher friction holds material still quickly, and the bar itself absorbs part of the blow | Transfers where spillage at the skirt line is the main complaint rather than belt cutting | Dry abrasive material, where heat build-up tears the surface and wear runs fast | Ask how the rubber is bonded to the backing and whether it can delaminate |
| Composite bar with ceramic or metal inserts | Insert resists cutting while the surrounding polymer keeps the face slippery for the belt | Severe transfers with very sharp heavy rock and no room to reduce the drop height | Anything where the insert can stand proud, because it will then score the cover | Ask for the insert pattern and how far it sits below the polymer face |
Material choice also decides how the bed behaves in the wet. Polymer keeps a low friction coefficient when the surface is wet, which is one reason a bed that feels acceptable in dry weather can become a slipping hazard for the belt during washdown. Rubber goes the other way and can become stickier as it wets, which helps material settle but adds drag. Neither behaviour shows up in a dry bench test, and both show up on the first rainy week after commissioning.
Where the bed and the belt are bought through the same conveyor belt distributor, the profile and cover questions are usually settled before either item is manufactured, because one technical contact owns both drawings. That is not the normal case. More often the belt comes from a conveyor belt factory that never sees the chute, the bars come from a local fabricator, and the drive belts arrive through a transmission belt manufacturer working to a completely different schedule. Add a plant that standardises its spare drive belts through a single V-belt manufacturer and you have four parties each holding a piece of the same two metres of belt, none of them holding all of it.
That split explains a pattern we see repeatedly. Belts ordered as wholesale conveyor belts on width, ply and cover grade alone arrive with a construction that is correct on paper and wrong for the transfer, because nobody wrote down the lump size or the drop. The bed is then designed around a belt that has already been made, which is the wrong order of operations.
A bed that is built correctly and set incorrectly behaves like a bed that was never needed. The setting work is not complicated, but it has three dimensions that interact, and getting two of them right still leaves a belt that either floats above the surface or drags on it along the whole length.
Start with the profile. The top face of the bars has to reproduce the trough the belt is already running in, which means a centre section plus two wings set to the same angle as the adjacent idlers. On a 35 degree trough the wings are set to 35 degrees and the joints between centre and wing are chamfered so the belt does not bridge a step. What must not happen is a bed built to one angle feeding a conveyor built to another, because the belt will be forced to re-form twice in three metres.
Then clearance. At rest, with an empty belt, the bar face should sit just below the belt line, close enough that the belt touches as soon as material lands and not so close that it polishes the bars while running empty. That band is a couple of millimetres, set with shims under the bar seats. Too high and the belt spans the bed as if it were a gap between idlers, which defeats the whole purchase. Too low and the belt runs on the bars permanently, adding drag and heat on every metre.
| Setting point on the finished impact bed | What it controls once in service | When it is set too small | When it is set too large | How to verify it on site |
|---|---|---|---|---|
| Trough angle of the wing bars | Whether the belt keeps its shape as it crosses the transfer | Belt runs flatter than the conveyor and drifts toward one edge | Belt is pinched into a deeper trough and the centre lifts off the bars | Lay a straight edge across the wings and read the angle against the idlers |
| Running clearance under an empty belt | When the belt first makes contact and how much drag it carries | Belt spans the bed like a gap, so the support never engages | Belt runs on the bars constantly, adding heat and polishing the surface | Feel for contact with a hand under the belt at three points along the bed |
| Bar spacing along the direction of travel | How evenly the load is shared and whether the belt can dip between bars | Belt dips into the gaps, which recreates the idler problem in miniature | Material packs into the gaps and the surface becomes a rasp under the belt | Check gap width against the smallest lump and look for packed fines |
| Length of supported section past the skirt | How much of the settling zone is covered before the belt returns to rolls | Material is still moving when it reaches the first roll and cuts continue | Extra drag and extra bars bought for a zone that no longer needs them | Chalk the belt and see where the mark survives a loaded run |
| Chamfer and fixing head treatment at bar ends | Whether the belt edge can catch a lip and start a longitudinal tear | A sharp end stands slightly proud and starts a tear within a few shifts | Deep chamfers reduce the wearing area and the bar wears through faster | Run a gloved hand along both ends and check every plug is still fitted |
The transition back to rolls deserves its own attention because it is where beds get blamed for problems they did not cause. If the last bar sits higher than the first roll, the belt steps down and the material tips forward, which shows up as spillage twenty metres downstream. If the last bar sits lower, the belt steps up over the steel conveyor roller and the splice takes a small impact on every revolution, which shows up as a splice failure six months later. The two surfaces should be set with the same straight edge and the same reference, and the roll frame should be shimmed to the bed rather than the bed to the frame.
Skirt sealing completes the picture. The rubber should touch the belt with light contact along its full length and should never be pulled tight enough to press the belt onto the bars. A skirt that is too tight adds the load of a second sliding surface, and the bed's drag calculation quietly becomes wrong. A skirt that is too loose lets the stream spread, and the bars wear at the edges instead of the centre, which is the wear pattern an experienced fitter reads first.
An impact bed fails in two ways and they need two different inspections. The slow way is wear, which announces itself over months and can be planned for. The fast way is loosening, which announces itself as a bang on a Sunday night and a torn belt on Monday morning. Plants that inspect only for wear tend to be surprised by the second one.
Wear is measured, not estimated. Pick four points along the bed, stamp a number beside each, and record the remaining thickness from the bar face down to the top of the fixing counterbore. That last dimension is the one that matters, because a bar with plenty of polymer left but a counterbore breaking through is finished. The practical rule most maintenance teams settle on is to schedule replacement when 20 mm of material remains above the fixing and to stop running when 10 mm remains, since below that the bolt head starts acting as a cutting tool rather than a fastener.
The wear pattern tells you whether the bed is set correctly, and it is worth reading before ordering a replacement set. Even wear across the full width means the stream lands where the chute was designed to put it. Heavy centre wear with untouched wings means the discharge is concentrated and the chute needs a deflector or a rock box rather than thicker bars. Heavy edge wear means the skirt is leaking or the belt is not running centred. Wear at the upstream end means the bed starts too late.
On a recycling line we looked at last year, the bars had been in for fourteen months and the maintenance team was proud of how little they had worn. The thickness readings were fine. What was not fine was the cushion, which had taken a permanent set of 9 mm under the centre bars and had stopped springing entirely, so the belt had been landing on what was effectively a rigid block. The bars had done their job of not wearing out. The bed had stopped doing its job of removing energy. We replaced six cushion pads and left the bars in place.
| What you actually see on inspection | Most likely cause sitting behind it | Where to look next to confirm | Action and urgency on the spot |
|---|---|---|---|
| Bolt heads polished bright and standing proud | Polymer has worn down to the counterbore and the belt is now touching steel | Measure remaining thickness at the two bars under the discharge stream | Change those bars at the next stop and inspect the cover above them |
| Fine black dust collecting under the bed | Belt cover is being abraded from below by grit embedded in the bar face | Wipe a bar clean and feel for a gritty, glazed surface rather than smooth polymer | Clean or replace the affected bars before the cover is thinned further |
| Bar rocking when pushed by hand | Cushion has taken a compression set or the fixing has lost preload | Check the pad under the bar and the witness marks on the fixing heads | Re-torque to the specified figure and replace any pad that stays flat |
| Material packed into the gaps between bars | Wet or sticky feed, or gaps wider than the fines fraction can bridge | Dig out one gap and see whether the packed material is damp and compacted | Add a washdown routine or close the spacing at the next bar change |
| Longitudinal score marks along the belt | A bar end or a fixing plug standing proud and catching the belt surface | Run a straight edge along the bar ends and check every plug is seated | Take the section out of service before the score becomes a tear |
The second inspection takes ten minutes with a torque wrench and a marker pen. Check every fixing for preload, mark each head with a paint stripe so movement is visible from the walkway, and look along the frame for rust streaks that start at a weld. A frame that has cracked at the rail end will let the whole bed drop a few millimetres on one side, and the first symptom is usually a belt that starts training toward that side for no obvious reason. Bed geometry and belt tracking are more closely linked than most maintenance schedules admit.
Spares policy matters as much as inspection frequency. A bed under a heavy transfer consumes bars on a schedule you can predict after the first replacement, so the second set should be on site before the first is finished. Holding one full set plus a few cushion pads costs far less than losing a shift, and it lets the team change a damaged bar when they find it rather than when the next delivery lands.
Most impact bed enquiries arrive as a belt width and a photograph. That is enough to quote something, and not enough to quote the right thing, which is why the first drawing often comes back with a note asking for the same information a second time. The data that actually changes the design is short, and none of it requires an engineering department to produce. Our service team works from exactly this list when a site survey is requested.
Start with the drop, measured from the chute lip to the belt surface with the belt loaded rather than empty. Then the top size and bulk density, the belt width and speed, the trough angle either side, and the length of the skirt boards. Add the distance from the discharge point to the first idler frame if the chute is offset, because an offset stream wears a pattern the drawing should anticipate.
| Data item to send with the enquiry | Why the supplier cannot guess it | How to state it in one line | What goes wrong when it is vague |
|---|---|---|---|
| Loaded drop height from chute lip to belt | It sets the energy per lump more than any other single figure | Give the measurement in millimetres with the belt running loaded | Bed is sized for a gentle transfer and is consumed in a few months |
| Top size, shape and bulk density of the material | A slab and a rounded cobble of the same mass load the bar differently | Name the material, the largest lump seen and the density in tonnes per cubic metre | Bar thickness and cushion hardness are chosen for the wrong pressure |
| Belt width, speed and trough angle | Together they fix the width of the bed and the shape of its surface | Quote all three from the idler drawing rather than from memory | Bars arrive flat when the conveyor runs a 35 degree trough |
| Skirt length and the settling distance | It decides how far the supported surface has to run past the chute | Give the skirt board length and where material visibly stops moving | Bed stops short and the first roll downstream takes the remaining impact |
| Frame dimensions and existing fixing centres | The bed has to bolt to steel that already exists in a fixed position | Send a sketch with stringer spacing, rail height and bolt hole centres marked | Bed arrives and cannot be fitted without cutting the frame on site |
Two interface questions are worth settling before the order rather than after. The first is who supplies the skirt rubber and the clamp bars, because a bed supplier who assumes the chute contractor is doing it and a chute contractor who assumes the opposite will leave a gap that fills with material on the first shift. The second is access. If the bars have to come out through the chute, the chute needs a door; if they come out sideways, the walkway needs the clearance. A bed that cannot be serviced is a bed that will be run to destruction and then replaced as a complete assembly.
None of this takes long to collect. It is the difference between buying a shape that fits and buying a support surface that removes energy from the belt, which is what the load point needed in the first place and the cheaper answer once belt replacements are counted honestly. Our conveyor idler factory RFQ checklist covers the surrounding idler data if the same review is extending past the transfer.
Request a load point bed drawing for your transfer
Look at where the damage is rather than at how much there is. If the cover is cut in a line that sits between two idler frames, the belt is being folded into an unsupported gap and no roll change will fix it. If the damage sits directly over a roll and the belt is otherwise sound, the roll pressure is the problem and impact rolls are the cheaper answer. A transfer with a drop over two metres and sharp lumps usually needs continuous support, because the energy is high enough that the gap itself becomes the failure mechanism.
It adds drag, and the amount depends on bed length, belt weight and whether the surface is wet. Over two or three metres the extra torque is usually absorbed by the margin a conveyor already carries, but a loaded incline with a thin margin will notice it at every start. Give the drive supplier the bed length and the friction figure, then check the starting ramp. Beds that run far past the settling zone are the ones that cause trouble.
Usually the bars, and that is the intended order. They are the cheapest part in the stack and the easiest to reach. The exception is a bed that has been hit hard enough to take a compression set out of the cushion pads, which then stop springing and turn the whole assembly into a rigid block. That failure is invisible from a thickness reading, so press a bar down by hand during the walk-past and see whether it returns. If it stays down, the pads are finished even when the bars look good.
Because a heavier cover adds material in the path of the blow without taking energy out of the carcass. The cover buys time before it is breached, and once it is breached the plies underneath see the same load they always did. The second effect is worse, since thick cover hides deep cuts and the next lump opens them at the splice. If the cutting pattern did not change after the upgrade, the energy is still arriving in the same place and the support under the belt is still the same gap it was before.
In most cases yes, provided the stringers are sound and there is room to hang a frame below the belt line. The work is usually done through a chute door or from the walkway with the belt held and the section isolated. What decides feasibility is the fixing centres and the height under the belt, not the age of the conveyor. Send a sketch of both and the frame can be built to suit rather than cut to fit.
Far enough that the material has stopped moving relative to the belt, which is a measurement rather than a rule. A practical starting point is one metre past the end of the skirt, then chalk the belt and run it loaded to see where the mark survives. Everything upstream of that point is still delivering energy into the surface. On fast belts the settling distance grows quickly, so a layout copied from a slow line will come up short.