Coal handling at a power plant is not one duty but a chain of them: unloading, stockpile reclaim, bunker feed, blending and ash removal all move the same black material under very different conditions. Moisture and dust separate those duties far more sharply than tonnage does, which is why a specification copied from a cement plant tends to disappoint on a stockpile line. The article compares the stages on lump size, surface water, dust load, impact energy and cleaning demand, then ties each one to the cover, carcass, trough angle and belt speed that suit it. Carryback, skirt leakage and return strand build-up get their own treatment, because most belt complaints at a plant start there rather than at the carcass. Ash handling is named as a separate high temperature selection problem and deliberately left out of scope. A failure signature table closes the argument, mapping torn edges, grooved covers and polished pulleys back to the stage and the component responsible.